For roofing contractors and exterior crews

A roofing estimate
built on squares, flashing and honest decking rules.

Itemize roof squares, pitch waste factors, ice-and-water barrier, dumpster haul-away, and per-sheet plywood rates so homeowners approve without fear of hidden add-ons.

Free to use - No signup - PDF + PNG

What you send

A one-page proposal clients actually read.

  • Squares & waste math shown. Display net roof area plus 10%–15% hip/valley shingle cut waste clearly.
  • Underlayment & flashing specs. Specify synthetic felt, ice-and-water shield, drip edge, and chimney step flashing.
  • Per-sheet decking transparency. State exact per-sheet OSB/plywood replacement rates before tear-off begins.
  • Magnet sweep & dumpster cover. Outline daily yard magnet sweeps, driveway protection, and debris disposal.

Proposal

Your Business

#4821

Prepared for Thomas Miller

Project 24-square architectural shingle roof replacement

Architectural shingle system & synthetic underlayment (24 sq + 12% waste) × 27$5805.00
Roof flashing, pipe boots, drip edge & ridge vent × 1$680.00
Single-layer tear-off, installation labor, dumpster & magnet sweep × 24$5640.00
Total$12125.00
Open the editor with this template

Pre-filled — just change names and prices.

Field Standard • On-Site Audit

Pre-Bid Roofing Inspection & Decking Audit

Verify roof squares, pitch steepness, tear-off layer count, flashing details, and dumpster staging before quoting.

0 / 6 On-Site Checks Verified
  • Existing Roof Layer Count & Attic Deck Check

    Inspect eaves and attic underside for double shingle layers, spaced skip-sheathing, or dark water-stained OSB/plywood decking.

  • Pitch Multiplier & Valley/Hip Waste Factor

    Measure roof pitch (e.g., 4/12 vs. 9/12 steep slope) and tally hips/valleys/dormers to apply exact 10%–15% shingle cut-waste allowance.

  • Eave Ice-and-Water Shield & Code Underlayment

    Verify local cold-climate ice barrier width (24 in. inside exterior wall plane) and synthetic underlayment overlap requirements.

  • Chimney, Skylight & Wall Step-Flashing Audit

    Inspect masonry chimney counter flashing and wall transitions—tar caulk patches must be rebuilt with step flashing + metal counter flashing.

  • Intake Soffit & Exhaust Ridge Vent Balance

    Check net free ventilation area (1 sq ft per 150–300 sq ft attic floor) and never mix gable fans with new ridge vents.

  • Dumpster Driveway Pads & Landscape Tarp Plan

    Confirm trailer/dumpster staging location with protective timber planks and delicate shrub tarping prior to tear-off day.

Technical Benchmarks • Zero Hidden Markups

Job Costing & Material Estimation Standard

Roofing square (100 sq ft) waste math, tear-off weight, and crew production benchmarks.

Shingle Bundles & Squares With Cut Waste

(Plan Footprint Sq Ft × Pitch Multiplier ÷ 100) × (1.10 Gable or 1.15 Hip/Valley) × 3 Bundles/Sq

Worked Example: 2,400 sq ft × 1.12 waste = 26.88 → Order 27 squares (81 bundles)

4×8 Plywood / OSB Decking Replacement Rate

Damaged Area Sq Ft ÷ 32 sq ft per 4×8 Sheet = Exact Sheet Count

Worked Example: 4 rotted 4×8 sheets verified w/ tear-off photos × $85/sheet = $340.00

Trade Task / ScopeStandard Labor OutputMaterial Coverage / WastePrep & Complexity Factor
Single-Layer Tear-Off & Architectural Shingle Install1.2 – 1.8 sq / crew-hr10%–15% shingle & felt waste+35% for steep pitch (>= 8/12) or 2nd-layer tear-off
Rotted OSB/Plywood Decking Sheet Swap (Mid-Tear-Off)20 – 30 mins / sheet32 sq ft per 4×8 panelMust attach dated photos of soft sheathing
Masonry Chimney Step & Counter Flashing Rebuild3.0 – 5.0 crew hrsStep tins + reglet lead/alum + sealant+2.5 hrs if wide chimney requires metal cricket
Standing Seam Metal Roof Installation (24-Ga)0.5 – 0.8 sq / crew-hrHigh-temp underlay + custom trimRequires concealed clip thermal expansion spacing
Scope Clarity • Dispute Prevention

Common Quoting Ambiguities vs. Transparent Alternatives

Replace vague roofing line items that trigger surprise charges or unpaid rework with clear, measurable scope language.

Dispute Trigger / Scope AreaAmbiguous Quote Wording (Avoid)Why It Causes DisputesTransparent Quote Alternative (Use This)
Rotted Plywood Decking Surprises
Includes minor wood replacement as needed
Leaves homeowners exposed to $150–$250/sheet shock bills during tear-off, or lets roofers nail new shingles into soft, crumbling OSB.

Includes inspection after tear-off; up to 2 sheets of 1/2" CDX plywood included. Additional damaged 4×8 sheets replaced strictly with dated photos at $85/sheet installed (labor + material).

Ice-and-Water Shield vs. Tar Paper
Install roof underlayment and shingles
Does not specify synthetic felt vs. tear-prone #15 tar paper or whether ice-and-water membrane protects eaves and valleys.

Install peel-and-stick Ice & Water Shield along all eaves (minimum 3 ft up from exterior wall) and roof valleys, plus tear-resistant synthetic underlayment across remaining deck.

Flashing Reuse vs. New Replacement
Seal pipes and chimney around roof
Slapping roof caulk onto cracked 20-year-old neoprene pipe boots guarantees attic leaks within 18 months.

Replace all plumbing vent pipe collars with new lifetime metal/silicone boots, install new painted aluminum drip edge on all rakes/eaves, and rebuild chimney step & counter flashing.

Mutual Consent • Copyable Contract Terms

Fair Quoting & Scope Protection Clauses

Copy these transparent, plain-English clauses directly into your roofing proposal terms to protect both contractor and client from unforeseen defects, supply shifts, and warranty disputes.

Transparent Pricing

Concealed Decking & Skip-Sheathing Rate Clause

CONCEALED DECKING PROTOCOL: Roof sheathing cannot be fully inspected until old shingles and felt are stripped. Any rotted or delaminated 4×8 OSB/plywood sheets discovered during tear-off will be photographed prior to removal and replaced at a pre-agreed flat rate of $[Rate]/sheet installed.

Site Care

Driveway Protection & Magnetic Nail Sweep

PROPERTY PROTECTION & CLEANUP: Protective wood planks are placed beneath roll-off dumpsters/trailers, landscaping is tarped during tear-off, and crew performs a double magnetic nail sweep of driveways, walkways, and lawn perimeters before final sign-off.

Fair Warranty

Rain Delay & Workmanship Leak Warranty

WEATHER & WORKMANSHIP WARRANTY: Roofing tear-off pauses or reschedules cleanly if rain radar threatens exposed decking. Installation workmanship is warranted against roof leaks for 5 years (excluding acts of God, hail/wind storm damage above shingle rating, clogged gutters, or chimney masonry cracking).

How it works

Three steps, two minutes.

01

Enter roof squares & pitch

Set tear-off layers, architectural shingle grade, and flashing counts.

02

Verify decking rate & terms

Add per-sheet plywood allowance and clear weather-delay rescheduling rules.

03

Download PDF or PNG

Send itemized PDF by email or PNG straight after the roof inspection.

Trade Guide

What to Include in a Transparent Roofing Proposal

Homeowners distrust vague roofing bids because they cannot easily climb onto the roof to verify underlayment quality or flashing details once shingles are nailed down. A trustworthy roofing quote resolves that by itemizing exact system components: tear-off layer count, synthetic underlayment vs. felt, ice-and-water membrane along eaves and valleys, aluminum drip edge, pipe boots, ridge vent cut-in, and manufacturer shingle grade.

Equally essential is setting pre-tear-off rules for concealed wood decking and weather protection. Specify how many sheets of damaged OSB/plywood (if any) are included and state the exact installed per-sheet cost for additional rotted panels discovered with dated photo proof. Clarify driveway protection pads for dumpsters, multiple daily magnet nail sweeps, and weather-delay scheduling when rain threatens open tear-off.

Average Pricing & Benchmarks

Industry standard estimates (2026)

Use these typical cost baselines to price your roofing bids competitively and transparently.

Service / ScopeTypical RangeBilling Model
Architectural Shingle Roof Replacement$425 - $680Per roofing square (100 sq ft)
Rotted Roof Decking Replacement$75 - $110Per 4×8 OSB / CDX plywood sheet
Chimney Step & Counter Flashing$450 - $950Flat per chimney masonry unit
Standing Seam Metal Roofing$950 - $1,550Per roofing square installed

Common questions

Why should roofing quotes state a per-sheet decking rate before tear-off?

Rotted OSB or plywood sheathing is hidden beneath old shingles and felt. Pre-agreeing on a fair per-sheet rate (e.g., $75–$95 per 4×8 sheet installed) eliminates surprise tear-off disputes.

How many squares and how much waste factor should a shingle roof include?

One roofing square equals 100 sq ft (3 standard bundles). Add 10% waste for simple gables and 12%–15% for cut-up hip, valley, and dormer roofs.

Can I separate tear-off dumpster disposal from shingle installation?

Yes — listing tear-off, dumpster rental, and nail magnet sweeping separately shows homeowners the full logistical cost of roof replacement.

Does a new roof quote include replacing skylights or rotted fascia?

Skylight unit swaps, gutter replacements, and exterior fascia carpentry should be listed as optional add-ons or explicit exclusions unless visually verified and quoted.

Are any measurements or photos uploaded to QuoteFast?

No. Your client info and bid pricing run 100% client-side in your browser.

Ready to send your roofing proposal?

Open the free editor — no signup. Download PDF for email or PNG for texting.